Here it comes |

No.2 hugging the cliff |

Making the turn at "Screaming Mimi Turn" |

No.2 calling the Roundhouse - over! |

Temporary end of track at the site of
the Great Trestle over Holy Moley Gulch |

One of 12 redwood trestle
bents being assembled. 9/3/09 |
|

Trestle bents and stringers
positioned for trim and fit over waterfall. More rocks will be
added to
make it look like stream goes into foreground |

Overview: Rest of trestle
will curve from the left then the other end of track will be
connected for a continuous 105 foot long loop. |

9/12/09 |

Check fit 9/12/09 |

First part of Great Trestle
ready for track 9/13/09 |

Alignment check 9/13/0909 |

Jr. Engineer Daniel makes
first run onto
Great Trestle over Holy Moley Gulch
Thanksgiving Day 2009 |

Construction of the Great
Trstle resumes 12/5/09 |

12/5/09 |

Snowy morning 12_8_09 |

A little snow never slows
construction 12/8/09 |
 |

End of the day 12/8/09 |
The end is in sight 12/8/09 |

12/12/09 The loop is complete.
The train is coming. |

1st Train over the finished
trestle |

Whew, we made it! |

And away we go.
Now comes the siding, spur and landscaping |

Mainline and siding fnished
1/4/10 |

|

1st train over new mainline
alignment |

Oops! Ballast reguator left boulder on siding |

Problem solved |
 |
 |

Success! |
|
|
|
|